• Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg
  • Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg
  • Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg
  • Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg
  • Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg
  • Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg

Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg

Material: Metal
Usage: Sofa, Table, Cabinet, Bed, Chair
Condition: New
Customized: Customized
Height: H=40/50/60/80/100/120/140/160mm
Thickness: 0.4~1.2mm
Customization:

Contact Supplier

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
BL0103
Finish
Chrome/Nickel/Spray Colors
MOQ
2000PCS
Transport Package
1PCS/Ploybag, 60PCS or 100PCS/Carton
Specification
H=40/50/60/80/100/120/140/160MM
Trademark
Buywes
Origin
Guangdong, China
HS Code
94019090
Production Capacity
500, 000PCS/Month

Product Description

Product Information:Model NO.: BL0103                                                                             Color: Chrome/Nickel/Spray Colors 
Top Plate: 70*52MM                                                                             Diameter: 40/45/47/50mm
N.W:                                                                                                      Trademark: BUYWES
Height: H=40/50/60/80/100/120/140/160MM                                        HS Code: 94019090
Origin: Guangdong, China
 
Material  Steel/Iron
Height H=40/50/60/80/100/120/140/160MM
Thickness T=0.4~1.2MM
Color Chrome/Nickel/Spray Colors
Top Plate 70*52MM
Diameter 40/45/47/50mm
MOQ 2000PCS
Leadtime 25~35 days after deposit confirmation.

Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg
Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg Hot Sale Factory Directly Chrome Metal Furniture Table Sofa Leg






FAQ:

Q1: Can your company customize per customer's samples or engineering drawings?

****Yes, our Professional engineers always do good job and customize making for clients.

Q2: Can you put my brand name(logo)on these products?

****Of course, we can. But we have MOQ to put your brand on the products. And some of the products are not suitable for making Logo on them.

Q3: How many hours of Salt Spray Testing can your products meet?

****Generally 48hrs can meet most customer's requirements right now. If Clients require more than this, such as 72hrs, 96hrs. It is also no problem. We will confirm with clients at the stage of placing orders.

Q4: What is the MOQ for your  Products?

****Normally 1000PCS Per type for Sofa Legs and Handles, 1000Sets per size for Ball Bearing Slides, 5000PCS per type for  Cabinet Hinges. If there is Stock, then no MOQ requirements.

Q5: Can I get sample(s) for quality checking?

****Sure. We welcome sample order to test and check quality.

Q6: How long can I expect to get the sample(s)?

****It will be ready for delivery in 7~15 days. The samples will be sent to you via express and arrive in 3~5 days. You can use your own express account or prepay us if you do not have an account.

Q7: What is the package?

****We can provide PE bag, blister packager and carton box packaging. We also can make your own designed OEM package.

Q8: How about your supply capacity per month?

*****300,000~350,000PCS per month around. Or 2~3*40GP full containers' capacity.

Q9:What about the lead time for mass production?

****Honestly, it depends on the order quantity and the season you place the order. The lead time of MOQ is about 25-35 days. 

Q10: What is your regular payment terms ?

****T/T, West Union, Paypal, AliPay, L/C are all acceptable.


Many Thanks For Your Attention To Our Products!

Welcome To Contact Us For More Details.

 

Send your message to this supplier

*From:
*To:
avatar Mr. Jerry Huang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
1000000 RMB
Plant Area
15000 square meters